Industrial Site Selection, Supply Risk & Plant Operations

Zoning, flood, rail, power, workforce and permits for every candidate site, then IT/OT monitoring once the plant is live.

Candidate sites: 3 of 41 shown

Example: 200,000 sq ft assembly plant

Zoning
By right
Flood
Zone X/AE
Rail
0.4 mi
Power
18 mo
Workforce
Strong
Permits
Slow

Site B ranks first. Power lead time is the open item to confirm with the utility.

Screen Every Candidate Site on the Same Six Checks

Stop assembling site files by hand. MapZot.AI pulls the facts for each parcel into one comparable view, so your team debates the shortlist and not the data.

Zoning

Permitted uses, setbacks, height and overlay districts, with the source ordinance linked.

Flood

FEMA zones, base flood elevation and drainage history for the parcel and its access roads.

Rail

Distance to the nearest line, the serving carrier, and whether a spur is already in place.

Power

Nearby substations, available capacity and the utility's typical interconnection timeline.

Workforce

Skilled labor within commute range, wage levels and competing employers.

Permits

Required approvals, the agencies involved and realistic review times by jurisdiction.

Know Where Supply Can Break

Map your suppliers, ports and lanes against the hazards that stop shipments.

  • Supplier exposure: see which tier-1 and tier-2 sites sit in flood, wildfire or storm zones.
  • Single points of failure: find the bridge, port or rail yard that many lanes depend on.
  • Early alerts: get notified when an event affects a site or route you rely on.

Keep the Plant Running Once It Opens

The site data you chose on carries into daily operations, so nothing is re-entered.

  • One view of IT and OT: assets, networks and controllers on a single floor map.
  • Anomaly detection: flag unusual traffic or equipment behavior before it stops a line.
  • Context for every alert: know which line, which zone and which supplier it touches.

From First Parcel To Live Plant, One Platform

Site and operations teams usually work in separate tools. Here they share the same map and the same record.

Before You Build

Compare sites, check supply risk and keep a documented reason for the decision you can show leadership and lenders.

After You Open

Monitor IT/OT systems against that same record, so operations inherits the risks that were already identified.

Bring Us Your Shortlist

Send three candidate sites and we will show you the comparison on your own data.

Book a Demo